Basit öğe kaydını göster

dc.contributor.authorDalgic, Süleyman
dc.date.accessioned2021-03-03T09:33:30Z
dc.date.available2021-03-03T09:33:30Z
dc.date.issued2003
dc.identifier.citationDalgic S., "Tunneling in fault zones, Tuzla tunnel, Turkey", TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, cilt.18, sa.5, ss.453-465, 2003
dc.identifier.issn0886-7798
dc.identifier.otherav_1d9ca995-2619-43ab-a9ce-fe4be5f56a21
dc.identifier.othervv_1032021
dc.identifier.urihttp://hdl.handle.net/20.500.12627/25093
dc.identifier.urihttps://doi.org/10.1016/s0886-7798(03)00045-2
dc.description.abstractThe Tuzla tunnel was excavated mainly in fault zones, shale and limestones using the conventional and shielded tunnel boring machine (TBM) methods. Fault zones in shales are brecciated and clayey, while those In limestones are of blocky structure. The rock mass rating, rock mass classification and support systems proposed for fault zones in Tuzla tunnel are insufficient for explaining the deformation and failure mechanisms encountered in the tunnel. In addition, dyke exposures, the fault-collapsed karstic system and groundwater also caused some problems during the excavation of the tunnel. The most important event relevant to fault zones in the Tuzla tunnel was the selection of a TBM. Before the excavation of the tunnel, the rock was determined to be of poor to fair quality. Therefore, tunneling with a TBM in rock of poor to fair quality was thought to be economic. However, during the excavation, fault zones with poor to very poor rock characteristics were encountered along an area comprising 70% of the tunnel length. The fault zones caused jamming of the TBM cutter and deviation from the tunnel alignment. In this respect, tunneling with the TBM method was quite problematic. Geotechnical problems encountered in the fault zones required special measures to be taken in the tunnel. With these measures, excavation and supporting of the tunnel were completed successfully by transforming heterogeneous conditions in the fault zones to homogeneous conditions in the tunnel impact area. (C) 2003 Elsevier Science Ltd. All rights reserved.
dc.language.isoeng
dc.subjectMühendislik ve Teknoloji
dc.subjectYapı
dc.subjectİnşaat Mühendisliği
dc.subjectMÜHENDİSLİK, SİVİL
dc.subjectMühendislik, Bilişim ve Teknoloji (ENG)
dc.subjectMühendislik
dc.subjectİNŞAAT VE YAPI TEKNOLOJİSİ
dc.titleTunneling in fault zones, Tuzla tunnel, Turkey
dc.typeMakale
dc.relation.journalTUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
dc.contributor.departmentİstanbul Üniversitesi , ,
dc.identifier.volume18
dc.identifier.issue5
dc.identifier.startpage453
dc.identifier.endpage465
dc.contributor.firstauthorID37830


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster