Show simple item record

dc.contributor.authorZalmai, Lemar Mohammad
dc.contributor.authorAkcay, Cemil
dc.contributor.authorManisali, Ekrem
dc.date.accessioned2021-03-04T13:35:30Z
dc.date.available2021-03-04T13:35:30Z
dc.date.issued2019
dc.identifier.citationZalmai L. M. , Akcay C., Manisali E., "Time-cost optimization using harmony search algorithm in construction projects", REVISTA DE LA CONSTRUCCION, cilt.18, sa.2, ss.226-237, 2019
dc.identifier.issn0718-915X
dc.identifier.otherav_7d394b1f-9edc-4d30-8a2a-f675a77b20e6
dc.identifier.othervv_1032021
dc.identifier.urihttp://hdl.handle.net/20.500.12627/85576
dc.identifier.urihttps://doi.org/10.7764/rdlc.18.2.226
dc.description.abstractIn construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are allocated to shorten the project duration considering the completion time and cost of the activities so that the most suitable construction schedule is prepared by providing a trade-off between project duration and total cost. In the case of time-cost trade-off problems, the total cost of the project is determined by summing each activities' cost by adding indirect costs. Moreover, total project duration is determined by obtaining total project duration after CPM (Critical Path Method) calculations. Obtaining optimum duration and costs is such a problematic issue with using conventional methods and common software packages. These techniques consider deterministic project values and include CPM calculations for fitness value calculation. Moreover, current studies defined alternatives as non-variable discrete values. However, construction projects are dynamic processes, and quantities are prone to be changed related to project size. In this study, time-cost trade-off optimization is performed by using harmony search method with introducing different implementation that can be more easily used for different projects. The model is implemented in a real construction project, and the conclusions are interpreted.
dc.language.isoeng
dc.subjectMühendislik ve Teknoloji
dc.subjectMÜHENDİSLİK, SİVİL
dc.subjectYapı
dc.subjectİnşaat Mühendisliği
dc.subjectMühendislik, Bilişim ve Teknoloji (ENG)
dc.subjectMühendislik
dc.subjectİNŞAAT VE YAPI TEKNOLOJİSİ
dc.titleTime-cost optimization using harmony search algorithm in construction projects
dc.typeMakale
dc.relation.journalREVISTA DE LA CONSTRUCCION
dc.contributor.departmentİstanbul Üniversitesi-Cerrahpaşa , ,
dc.identifier.volume18
dc.identifier.issue2
dc.identifier.startpage226
dc.identifier.endpage237
dc.contributor.firstauthorID265693


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record