dc.contributor.authorDemir, Murat
dc.contributor.authorAkay, Anıl Orhan
dc.contributor.authorAkgul, Mustafa
dc.date.accessioned2021-03-04T18:41:51Z
dc.date.available2021-03-04T18:41:51Z
dc.date.issued2018
dc.identifier.citationAkay A. O. , Demir M., Akgul M., "Assessment of risk factors in forest road design and construction activities with fuzzy analytic hierarchy process approach in Turkey", ENVIRONMENTAL MONITORING AND ASSESSMENT, cilt.190, 2018
dc.identifier.issn0167-6369
dc.identifier.othervv_1032021
dc.identifier.otherav_8c12eef7-8f55-4f71-8368-804a2a43de2d
dc.identifier.urihttp://hdl.handle.net/20.500.12627/94776
dc.identifier.urihttps://doi.org/10.1007/s10661-018-6948-0
dc.description.abstractForest road design and construction are time-consuming and complicated because various risk factors can be encountered during the process. The aim of this study is to comprehensively assess the risk factors in forest road design and construction using the fuzzy analytic hierarchy process (AHP) method in Turkey, thus contributing to the proper performance of these activities. Within the scope of the study, six main risk factors and 22 sub-risk factors were identified based on literature review. In order to determine the weights of the relevant risk factors, the opinions of three different groups [(group 1: academicians), (group 2: forest engineers (private sector employees + public sector employees)), (group 3: group 1 + group 2)] about the risk factors were obtained. Relevant risk factor weights were determined using the fuzzy AHP method. According to group 3, the most important main risk factors are technical risks and environmental risks. In addition, the most important sub-risk factors for each relevant main risk factor were incorrect road alignment, inadequate work safety in the field, insufficient capital, legal problems on the road alignment, landslide risk during road construction, and illegal logging. Differences were observed between groups 1 and 2 in the weight rankings of relevant risk factor. The results demonstrate that the fuzzy AHP method can be used effectively to assess the risks of forest road design and construction.
dc.language.isoeng
dc.subjectÇEVRE BİLİMLERİ
dc.subjectTarımsal Bilimler
dc.subjectÇevre Mühendisliği
dc.subjectMühendislik ve Teknoloji
dc.subjectTarım ve Çevre Bilimleri (AGE)
dc.subjectÇevre / Ekoloji
dc.titleAssessment of risk factors in forest road design and construction activities with fuzzy analytic hierarchy process approach in Turkey
dc.typeMakale
dc.relation.journalENVIRONMENTAL MONITORING AND ASSESSMENT
dc.contributor.departmentİstanbul Üniversitesi-Cerrahpaşa , Orman Fakültesi , Orman Mühendisliği
dc.identifier.volume190
dc.identifier.issue9
dc.contributor.firstauthorID81776